commercial build & workplace

51 Flinders Street - GPT/Deliotte

Role: Project Manager / Superintendent

Client: GPT via Deloitte

Architect: Bates Smart  

Builder: Lendlease

JXC Director, Luke Castledine, is leading Deloitte’s involvement in the 51 Flinders Lane development by GPT, ensuring their requirements are seamlessly integrated into the project.

Luke’s role includes providing strategic input and leading the superintendency role with Lendlease as the Head Contractor to create a premium office carbon neutral office building.

Role: Client-Side Project Manager

Client: Master Builders

Architect: Fieldworks  

Builder: Shape  

Kris Stevens, Associate Director at JXC, is the Development Manager for the Master Builders Victoria Head Office Refurbishment.

Valued at $22M, the project encompasses the upgrade of five floors and was completed in December 2025. Kris has led the project from early feasibility and workplace strategy through to delivery, providing end-to-end leadership in collaboration with Fieldworks Architect and head contractor Shape

Master Builders of Victoria (MBV) Head Office

“Project Honbu” - Head Office

Role: Project Manager / Superintendent

Client: Rinnai Pty Ltd

Architect: PTID   

Builder: Buildcorp

JXC were appointed to undertake the feasibility, workplace strategy, and delivery of Rinnai’s new Head Office. The facility adjoins an existing warehouse and includes a 3,200sqm fitout, facade refurbishment, and roof replacement. 

Alongside designers, PTID. Head Contractor, Buildcorp were appointed to undertake the works which are due for completion in January 2026.

Enervest Head Office Fitout

Role: Tenant Representative / Project Manager

Client: Enervest Pty Ltd

Architect: Hot Black   

Builder: Capabuild

With rapid growth outpacing their existing space, Enervest engaged JXC to secure a new 600m² office for their expanding team.

JXC led the site search for suitable locations and negotiated the Heads of Agreement and Agreement for Lease for their new premises at 627 Chapel Street. 

Following lease execution, JXC managed the fitout delivery and coordinated a seamless relocation, working closely with the fitout contractor and developer.

CoolDrive Head Office & Race Team

Role: Tenant Representative / Project Manager

Client: CoolDrive Pty Ltd

Architect: Hot Black

Builder: Qanstruct

JXC were appointed as Tenant Project Manager to manage the end-to-end delivery process and be the internal representative within the CoolDrive organisation.

JXC have undertaken functional briefing, workplace strategy and concept design alongside Hot Black Interior Designers to date and Qanstruct have been appointed via Charter Hall to complete the base building and integrated fitout.

111 Bourke Street - Australia Post

Role: Client-side Project Manager

Client: Australia Post Pty Ltd

Architect: Carr

Australia Post underwent a significant rework of its head office at 111 Bourke Street in Melbourne, involving a full fit-out of levels G to L20. This project aimed to establish a new working environment, with the adoption of activity-based working, which was tested on a pilot floor before being implemented across the building.

Caroline , JXC director acted as Construction Manager on this project responsible for end-to-end delivery including feasibility, design, delivery. Stakeholder management and staging was key the projects success having the requirement to move over 2,500 people to enable the works.

Role: Client-side Project Manager

Client: Australia Post Pty Ltd

Architect: Parker Design

JXC managed the design and delivery of 3 post offices for Australia Post. The delivery included maintaining operation during the fitout period and merchandising and direct procurement of long lead time items such as joinery.

The team at JXC have previously been involved in various Australia Post outlets throughout Australia.