commercial build & workplace
51 Flinders Street - GPT/Deliotte
Role: Project Manager / Superintendent
Client: GPT via Deloitte
Architect: Bates Smart
Builder: Lendlease
JXC Director, Luke Castledine, is leading Deloitte’s involvement in the 51 Flinders Lane development by GPT, ensuring their requirements are seamlessly integrated into the project.
Luke’s role includes providing strategic input and leading the superintendency role with Lendlease as the Head Contractor to create a premium office carbon neutral office building.
Role: Client-Side Project Manager
Client: Master Builders
Architect: Fieldworks
Builder: Shape
Kris Stevens, Associate Director at JXC, is the Development Manager for the Master Builders Victoria Head Office Refurbishment.
Valued at $22M, the project encompasses the upgrade of five floors and was completed in December 2025. Kris has led the project from early feasibility and workplace strategy through to delivery, providing end-to-end leadership in collaboration with Fieldworks Architect and head contractor Shape
Master Builders of Victoria (MBV) Head Office
“Project Honbu” - Head Office
Role: Project Manager / Superintendent
Client: Rinnai Pty Ltd
Architect: PTID
Builder: Buildcorp
JXC were appointed to undertake the feasibility, workplace strategy, and delivery of Rinnai’s new Head Office. The facility adjoins an existing warehouse and includes a 3,200sqm fitout, facade refurbishment, and roof replacement.
Alongside designers, PTID. Head Contractor, Buildcorp were appointed to undertake the works which are due for completion in January 2026.
Enervest Head Office Fitout
Role: Tenant Representative / Project Manager
Client: Enervest Pty Ltd
Architect: Hot Black
Builder: Capabuild
With rapid growth outpacing their existing space, Enervest engaged JXC to secure a new 600m² office for their expanding team.
JXC led the site search for suitable locations and negotiated the Heads of Agreement and Agreement for Lease for their new premises at 627 Chapel Street.
Following lease execution, JXC managed the fitout delivery and coordinated a seamless relocation, working closely with the fitout contractor and developer.
CoolDrive Head Office & Race Team
Role: Tenant Representative / Project Manager
Client: CoolDrive Pty Ltd
Architect: Hot Black
Builder: Qanstruct
JXC were appointed as Tenant Project Manager to manage the end-to-end delivery process and be the internal representative within the CoolDrive organisation.
JXC have undertaken functional briefing, workplace strategy and concept design alongside Hot Black Interior Designers to date and Qanstruct have been appointed via Charter Hall to complete the base building and integrated fitout.
111 Bourke Street - Australia Post
Role: Client-side Project Manager
Client: Australia Post Pty Ltd
Architect: Carr
Australia Post underwent a significant rework of its head office at 111 Bourke Street in Melbourne, involving a full fit-out of levels G to L20. This project aimed to establish a new working environment, with the adoption of activity-based working, which was tested on a pilot floor before being implemented across the building.
Caroline , JXC director acted as Construction Manager on this project responsible for end-to-end delivery including feasibility, design, delivery. Stakeholder management and staging was key the projects success having the requirement to move over 2,500 people to enable the works.
Role: Client-side Project Manager
Client: Australia Post Pty Ltd
Architect: Parker Design
JXC managed the design and delivery of 3 post offices for Australia Post. The delivery included maintaining operation during the fitout period and merchandising and direct procurement of long lead time items such as joinery.
The team at JXC have previously been involved in various Australia Post outlets throughout Australia.
Australia Post - South Yarra, Manly & Lismore